
Project Details
- Name:High-Speed Electric Train Construction Project
- Author:AMH Group
- Client:الهيئة العامة للطرق والكباري والنقل البري
- Location:وادي النطرون
- Share:
High-Speed Electric Train Construction Project
Construction of the Embankment Bridge and Industrial Works for the High-Speed Electric Train Project (Ain Sokhna – New Administrative Capital – Al Alamein – Matrouh) (5 km length)
Owning Entity: General Authority for Roads, Bridges, and Land Transport
Location: Wadi El Natrun
Year of Completion: 2023